In this paper, we give some basic notions concerning the st-connected
vertex separator problem(st-CVS problem), then we give mathematical
formula for st-CVS problem, then some special cases on some types of
graphs , after then introduce an integer programming formulations for
this problem. Also, we introduce a heuristic to solve this problem.
Exact and heuristic methods for the vertex separator problem
In this paper, we propose a practical and efficient methods to solve the vertex separator problem (VSP for short),
based on branch-and-bound procedure, which uses linear programming, and a greedy algorithm. This problem
arises in many areas of applications such as graph algorithms, communication networks, solving systems of
equations, finite element and finite difference problems. We show, by computational experiments, that our
approach is able to solve in short time large-scale instances of VSP from the literature to optimality or near
optimality.
On a new class of univalent with negative coefficient
European Journal of Scientific Research
Vol. 74
Issue 4
8
2012
On a new class of univalent with negative coefficient
In the present paper, we have introduced a subclass S(γ, α, µ) of univalent functions
with negative coefficients in the unit disc. We derive basic properties like coefficient
inequality, distortion and covering theorem, radius of convexity, extreme points, Hadamard
product, closure theorems and convolution operator for functions belonging to this class.
An efficient algorithm to solve 1//∑Ci +∑Yi
Journal of Al-Qadisiyah for Computer Science and Mathematics
Vol. 3
Issue 2
9
2011
An efficient algorithm to solve 1//∑Ci +∑Yi
althoby haeder younis
Journal of Al-Qadisiyah for Computer Science and Mathematics
3
2
9
Journal of Al-Qadisiyah for Computer Science and Mathematics
n the problem of scheduling a single machine to minimize the sum of completion time and total late work, there are n jobs to be processed for which each has an integer processing time and a due date. The objective is to minimize the sum of total completion time and total late work ,where the late work for a job is the amount of processing of this job that is performed after its due date.
Although dominance rules are derived for the special cases in which all processing times are equal and all due dates are equal. Algorithm H is presented for the general non preemptive sum of completion time and the total late work simultaneous problems
Single machine scheduling to minimize three hierarchically criteria
In this paper, to minimize a function of three cost criteria for scheduling n jobs on a
single machine , the problem is discussed :
{Minimizing a function of three criteria maximum tardiness ,maximum earliness and sum
square of completion time in hierarchical method }.
Single machine scheduling to minimize a function of square completion time and maximum earliness simultaneously
Journal of Al-Qadisiyah for Computer Science and Mathematics
Vol. 2
Issue 1
18
2010
Single machine scheduling to minimize a function of square completion time and maximum earliness simultaneously
althoby haeder younis
Journal of Al-Qadisiyah for Computer Science and Mathematics
2
1
18
Journal of Al-Qadisiyah for Computer Science and Mathematics
In this study, to minimize a function of two cost criteria for scheduling n jobs on a single machine , the problem is discussed :
“ Minimizing a function of total square completion time and maximum Earliness simultaneously”.
For this problem we proposed some algorithms to find exact(optimal) solution for hierarchical case and efficient (pareto optimal) solutions for simultaneous case. Also we proposed branch and bound algorithm to find exact solution for sum of total square completion time and maximum Earliness ,and present algorithm D to find exact solution in a fast way with respect to (BAB) method. We present computational experience for the (BAB) method and algorithm(D) on a large set of test problems
Single machine scheduling to minimize a function of square completion time and maximum tardiness simultaneously
Journal of Al-Qadisiyah for Computer Science and Mathematics
Vol. 2
Issue 1
18
2010
Single machine scheduling to minimize a function of square completion time and maximum tardiness simultaneously
althoby haeder younis
Journal of Al-Qadisiyah for Computer Science and Mathematics
2
1
18
Journal of Al-Qadisiyah for Computer Science and Mathematics
In this study, to minimize a function of two cost criteria for scheduling n jobs on a single machine , the problem is discussed :
“ Minimizing a function of total square completion time and maximum Earliness simultaneously”.
For this problem we proposed some algorithms to find exact(optimal) solution for hierarchical case and efficient (pareto optimal) solutions for simultaneous case. Also we proposed branch and bound algorithm to find exact solution for sum of total square completion time and maximum Earliness ,and present algorithm D to find exact solution in a fast way with respect to (BAB) method. We present computational experience for the (BAB) method and algorithm(D) on a large set of test problems