Currently, a rapid digital revolution is occurring in the building industry due to the need
to solve chronic challenges such as low productivity, inconsistent execution quality, and
difficulty in controlling costs and schedules. Construction supervision is one area where
digital transformation can have a significant impact, given the repetitive nature of its tasks,
which rely heavily on human expertise and manual labor. The aim of this study is to
develop a comprehensive framework to evaluate the role of the digital transformation in the
supervision of construction projects using the modeling of structural equations (PLS-SEM).
The data obtained was examined and evaluated utilizing the PLS-SEM software technique to
build the proposed model. The results show a positive correlation between the supervisor’s
productivity and the utilization of digital technology, depending on the context of the task
and the nature of the work. The study also proposes a methodology for the use of SEM in
this area, comprising model construction steps and evaluation indicators, and it provides
suggestions for researchers and practitioners to improve the effectiveness of using digital
transformation in construction supervision.
Evaluating alternative construction materials used in the floors of major halls in Iraq
The labor market has been constantly changing in recent decades, so choosing the type of construction materials
in general and floor finishing materials in particular is of great importance for construction projects. This research
helps to determine how to choose the flooring materials used in major halls in Iraq and how to employ TOPSIS,
Technique for Order Preference by Similarity to an Ideal Solution technical foundation in evaluating them. The
study involves determining the criteria used to find the optimal alternative, as well as determining the quality
index of those alternatives through the value engineering methodology in order to choose the best from this aspect.
Therefore, arriving at appropriate alternatives for the purpose of construction works that can be implemented in
the region, For the purpose of achiev-ing the goal of the research, the data was collected from the literature that
dealt with the topics of the system’s preference by similarity to the ideal solution and value engineering, Finally
from field visits and personal interviews with specialists from company managers and department and project
managers. Descriptive, analytical, and statistical approaches were adopted for the study, and the results of data
anal-ysis showed for sample members that carpet is the most relatively important alternative that can be cho-sen
for the purpose of constructing floors for large halls, based on the standards studied. Also, the sound insulation
standard is followed by the ease of maintenance standard, and then safety is more important than the rest of the
standards in evaluating alternatives to flooring materials.
Integration of Building Information Modeling (BIM) and Lean Construction Methods: A Pathway to Improved Project Delivery
Generally, issues persist in the construction industry due to inefficiency, cost overrun, schedule delay, and massive wastes that are factors promoting poor performance. Most current project management practices are plagued with fragmentation, insufficient coordination, or real-time information sharing, resulting in reworks or misallocation of resources. In addressing these issues, this work, therefore, probes how the integrated of Building Information Modeling (BIM) and Lean Construction (LC) as a combined approach may help in enhancing project efficiency, reducing the cost, and improving sustainability. The main goal of the work is to analyze what role BIM plays in enhancing construction project management, then to investigate the impact of Lean Construction (LC) on waste reduction and workflow optimization, and finally to assess the benefits and challenges of integrating both methodologies. Through the Delphi study and comparative analysis, it has been identified that the integration of BIM and LC in projects improves project efficiency by 25-35%, reduces project costs by 18-27%, and minimizes material waste by 30-40%, with a resultant increase in workflow efficiency by 20-25%. Despite these identified benefits, some key barriers exist, such as high initial implementation costs, resistance to change, and extensive training. The study concluded that structured training programs, improved software interoperability, and industry-wide collaboration facilitate the successful adoption of BIM-Lean integration. These results underpin BIM and LC methodologies as future transformers to affect more sustainable, cost-effective, and efficient construction project delivery.